 - Location: Amarsul-Seixal, Portugal
Substrate: MSW & green waste Commissioning: Autumn 2011 Capacity: 3 x 2'283 kg/h / 38'415 Nm3/a Biogas Type of plant: KOMPOGAS® fermentation, CHP Energy usage: CHP, heat recovery
Location: | Amarsul-Seixal, Portugal | Substrate: | Municipal Solid waste (MSW) & green waste | Commissioning: | Autumn 2011 | Capacity: | 53'000 t/a waste, 38'400 Nm3/a Biogas | Type of plant: | Mechanical Biological Treatment (MBT) of municipal waste, 3x KOMPOGAS® digester, CHP | Energy usage: | CHP, heat recovery |
 - Location: Wilp-Achterhoek (NL), VAR
Substrate: green waste Commissioning: December 2008 Capacity: 60'000 t/a Type of plant: Biogas plant, 2 x double digester Energy usage: CHP, heat recovery (both on-site)
Location: | Wilp-Achterhoek (NL), VAR | Substrate: | green waste | Commissioning: | December 2008 | Capacity: | 60'000 t/a | Type of plant: | Biogas plant, 2 x double digester | Energy usage: | CHP, heat recovery (both on-site) |  - Location: Inwil, Canton Lucerne (CH)
Substrate: Organic waste, cattle- and pork manure Commissioning: Summer 2008 Capacity: 16'000 t/a Kompogas® digester, 45'000 t/a liquid digestion Type of plant: Biogas plant, with Kompogas® digester and liquid digestion, fermentation residues and water treatment Energy usage: Biogas upgrading and feed into the gas grid, CHP, heat recovery
Location: | Inwil, Canton Lucerne (CH) "Swiss Farmer Power" | Substrate: | Organic waste, cattle- and pork manure | Commissioning: | Summer 2008 | Capacity: | 16'000 t/a Kompogas® digester 45'000 t/a liquid digestion | Type of plant: | Biogas plant, with Kompogas® digester and liquid digestion, fermentation residues and water treatment | Energy usage: | Biogas upgrading and feed into the gas grid, CHP, heat recovery |  - Location: Biogas plant Lavigny (CH)
Substrate: Organic waste Commissioning: Autumn 2007 Capacity:12'000 t/a / 130 Nm3/h Biomethane Type of plant: single digester Energy usage: Biogas upgrading and feed into the gas grid
Location: | Biogas plant Lavigny (CH) | Substrate: | Organic waste | Commissioning: | Autumn 2007 | Capacity: | 12'000 t/a / 130 Nm3/h Biomethane | Type of plant: | single digester | Energy usage: | Biogas upgrading and feed into the gas grid |  - Location: Groebern, Saxony (D)
Substrate: Energy crops Commissioning: May 2007 Capacity: 1 MW electr. power Type of plant: Biogas plant, double digester Energy usage: CHP, heat usage for sewage sludge drying and heating of buildings
Location: | Groebern, Saxony (D) | Substrate: | Energy crops | Commissioning: | May 2007 | Capacity: | 1 MW electr. power | Type of plant: | Biogas plant, double digester | Energy usage: | CHP, heat usage for sewage sludge drying and heating of buildings |  - Location: Stans (CH)
Substrate: Wood chips Commissioning: 2006/07 Capacity: 50 kW electr. power, 235 kW heat power Type of plant: PYROFORCE® wood gasification CHP Energy usage:CHP, heat recovery
Location: | Stans (CH) | Substrate: | Wood chips | Commissioning: | 2006/07 | Capacity: | 50 kW electr. power, 235 kW heat power | Type of plant: | PYROFORCE® wood gasification CHP | Energy usage: | CHP, heat recovery |  - Location: Reimlingen, Oberschwaben (D)
Substrate: Energy crops Commissioning: End 2006 Capacity: 1.3 MW electr. power Type of plant: Biogas plant, double digester Energy usage:CHP, on-site
Location: | Reimlingen, Schwaben (D) | Substrate: | Energy crops | Commissioning: | End 2006 | Capacity: | 1.3 MW electr. power | Type of plant: | Biogas plant, double digester | Energy usage: | CHP, on-site |  - Location: AC Zentrum Spiez (CH)
Substrate: Wood chips Commissioning: End 2003 Capacity: 150 kW electr. power, 235 kW heat power @ 90°C Type of plant: PYROFORCE® wood gasification CHP Energy usage: CHP, heat recovery
Location: | AC Zentrum Spiez (CH) | Substrate: | Wood chips | Commissioning: | End 2003 | Capacity: | 150 kW electr. power, 235 kW heat power @ 90°C | Type of plant: | PYROFORCE® wood gasification CHP | Energy usage: | CHP, heat recovery | |
|