Reference plants thermal hazwaste treatment (selection)

Location: ChinaFeedstocks: Solid, liquid and sludge waste from the petrochemical industryCommissioning: expected spring 2011Capacity: 1200 kg/h solid waste/ 400 kg liquid waste/ flue gas: 25'000 Nm3/hType of plant: Rotary kiln with SSC, Boiler and APC- system
Location: China
Feedstocks: Solid, liquid and sludge waste from the petrochemical industry
Commissioning: expected spring 2011
Capacity: 1200 kg/h solid waste/ 400 kg liquid waste/ flue gas: 25'000 Nm3/h
Type of plant: Rotary kiln with SSC, Boiler and APC- system

Location:

China

Feedstocks:

Solid, liquid and sludge waste from the petrochemical industry

Commissioning:

expected spring 2011

Capacity:

1200 kg/h solid waste/ 400 kg liquid waste/ flue gas: 25'000 Nm3/h

Type of plant:

Rotary kiln with SSC, Boiler and APC- system

Location: HungaryFeedstocks: solid, liquid and gaseous wastesCommissioning: 2004Capacity: 1200 kg/h / 15'000 Nm3/hType of plant: combustion chamber with multi-stage flue gas cleaning
Location: Hungary
Feedstocks: solid, liquid and gaseous wastes
Commissioning: 2004
Capacity: 1200 kg/h / 15'000 Nm3/h
Type of plant: combustion chamber with multi-stage flue gas cleaning

Location:

Hungary

Feedstocks:

solid, liquid and gaseous wastes

Commissioning:

2004

Capacity:

1200 kg/h / 15'000 Nm3/h

Type of plant:

combustion chamber with multi-stage flue gas cleaning

Location: GermanyFeedstocks: Waste sulfuric acid, sulfur, Heavy oil   Commissioning: 2002Capacity: 21'000 kg/h + 50'000 Nm3/h Type of plant: Acid cracking furnace
Location: Germany
Feedstocks: Waste sulfuric acid, sulfur, Heavy oil
Commissioning: 2002
Capacity: 21'000 kg/h + 50'000 Nm3/h
Type of plant: Acid cracking furnace

Location:

Germany

Feedstocks:

Waste sulfuric acid, sulfur, Heavy oil

Commissioning:

2002

Capacity:

21'000 kg/h / 50'000 Nm3/h

Type of plant:

Acid cracking furnace

Location: SwedenFeedstocks: chlorine-containing gases and liquid waste from VCM productionCommissioning: 2000Capacity: 15'000 Nm3/hType of plant: Flue gas scrubber, 3-stage, with HCl recovery
Location: Sweden
Feedstocks: chlorine-containing gases and liquid waste from VCM production
Commissioning: 2000
Capacity: 15'000 Nm3/h
Type of plant: Flue gas scrubber, 3-stage, with HCl recovery

Location:

Sweden

Feedstocks:

chlorine-containing gases and liquid waste from VCM production

Commissioning:

2000

Capacity:

15'000 Nm3/h

Type of plant:

Flue gas scrubber, 3-stage, with HCl recovery

Location: HungaryFeedstocks: liquid and solid refinery wastes and oil sludgesCommissioning: 1997Capacity: 40'000 Nm3/hType of plant: Combined flue gas cleaning with dry sorption and downstream flue gas scrubber
Location: Hungary
Feedstocks: liquid and solid refinery wastes and oil sludges
Commissioning: 1997
Capacity: 40'000 Nm3/h
Type of plant: Combined flue gas cleaning with dry sorption and downstream flue gas scrubber

Location:

Hungary

Feedstocks:

liquid and solid refinery wastes and oil sludges

Commissioning:

1997

Capacity:

40'000 Nm3/h

Type of plant:

Combined flue gas cleaning with dry sorption and downstream flue gas scrubber

Location: BrasilFeedstocks: chlorine-containing gases and liquid waste from the EDC productionCommissioning: 1996Capacity: 360 kg/h / 1250 Nm3/hType of plant: Combustion chamber, boiler and multi-stage flue gas scrubber with HCl recovery
Location: Brasil
Feedstocks: chlorine-containing gases and liquid waste from the EDC production
Commissioning: 1996
Capacity: 360 kg/h / 1250 Nm3/h
Type of plant: Combustion chamber, boiler and multi-stage flue gas scrubber with HCl recovery

Location:

Brasil

Feedstocks:

chlorine-containing gases and liquid waste from the EDC production

Commissioning:

1996

Capacity:

360 kg/h / 1250 Nm3/h

Type of plant:

Combustion chamber, boiler and multi-stage flue gas scrubber with HCl recovery

Location: FranceFeedstocks: Industrial wasteCommissioning: 1993Capacity:2700 kg/h / 25'000 Nm3/hType of plant: Rotary kiln and combustion chamber with multi-stage flue gas cleaning and wastewater treatment
Location: France
Feedstocks: Industrial waste
Commissioning: 1993
Capacity:2700 kg/h / 25'000 Nm3/h
Type of plant: Rotary kiln and combustion chamber with multi-stage flue gas cleaning and wastewater treatment

Location:

France

Feedstocks:

Industrial waste

Commissioning:

1993

Capacity:

2700 kg/h / 25'000 Nm3/h

Type of plant:

Rotary kiln and combustion chamber with multi-stage flue gas cleaning and wastewater treatment

Location: BrasilFeedstocks: Liquid waste from chemical siteCommissioning: 1990Capacity: 1400 kg/hType of plant: Combustion chamber and multi-stage flue gas scrubbing with HCl-recovery
Location: Brasil
Feedstocks: Liquid waste from chemical site
Commissioning: 1990
Capacity: 1400 kg/h
Type of plant: Combustion chamber and multi-stage flue gas scrubbing with HCl-recovery

Location:

Brasil

Feedstocks:

Liquid waste from chemical site

Commissioning:

1990

Capacity:

1400 kg/h

Type of plant:

Combustion chamber and multi-stage flue gas scrubbing with HCl-recovery