References

Reference plants waste treatment (selection)

Location: KVA Forsthaus, Bern (CH)Feedstocks: flue gases from waste incinerationCommissioning: expected 2012Capacity: 100'000 Nm3/hType of plant: raw gas SCR-DeNOx, heat exchanger, 3-stage scrubber, heat exchanger, baghousefilter, adsorbens system , draft fan
Location: KVA Forsthaus, Bern (CH)
Feedstocks: flue gases from waste incineration
Commissioning: expected 2012
Capacity: 100'000 Nm3/h
Type of plant: raw gas SCR-DeNOx, heat exchanger, 3-stage scrubber, heat exchanger, baghousefilter, adsorbens system , draft fan

Location:

KVA Forsthaus, Bern (CH)

Feedstocks:

flue gases from waste incineration

Commissioning:

expected 2012

Capacity:

100'000 Nm3/h

Type of plant:

raw gas SCR-DeNOx, heat exchanger, 3-stage scrubber, heat exchanger, baghousefilter, adsorbens system , draft fan

Location: IPALLE Thumaide, BelgiumFeedstocks: flue gases from waste incinerationCommissioning: 2009Capacity: 100'000 Nm3/hType of plant: a semi-dry flue gas Cleaning with a downstream flue gas scrubber
Location: IPALLE Thumaide, Belgium
Feedstocks: flue gases from waste incineration
Commissioning: 2009
Capacity: 100'000 Nm3/h
Type of plant: a semi-dry flue gas Cleaning with a downstream flue gas scrubber

Location:

IPALLE Thumaide, Belgium

Feedstocks:

flue gases from waste incineration

Commissioning:

2009

Capacity:

100'000 Nm3/h

Type of plant:

a semi-dry flue gas Cleaning with a downstream flue gas scrubber

Location: Bruxelles-Energy SCRL, BelgiumFeedstocks: flue gases from waste incinerationCommissioning: 2005Capacity: 3 x 150'000 Nm3/hType of plant:SCR-DeNOx-plant
Location: Bruxelles-Energy SCRL, Belgium
Feedstocks: flue gases from waste incineration
Commissioning: 2005
Capacity: 3 x 150'000 Nm3/h
Type of plant:SCR-DeNOx-plant

Location:

Bruxelles-Energy SCRL, Belgium

Feedstocks:

flue gases from waste incineration

Commissioning:

2005

Capacity:

3 x 150'000 Nm3/h

Type of plant:

SCR-DeNOx-plant

Location: IVBO Brugge, BelgiumFeedstocks: Flue gases from waste incinerationCommissioning: 2004Capacity: 3 x 67'000 Nm3/hType of plant:SCR-DeNOx-plant
Location: IVBO Brugge, Belgium
Feedstocks: Flue gases from waste incineration
Commissioning: 2004
Capacity: 3 x 67'000 Nm3/h
Type of plant:SCR-DeNOx-plant

Location:

IVBO Brugge, Belgium

Feedstocks:

Flue gases from waste incineration

Commissioning:

2004

Capacity:

3 x 67'000 Nm3/h

Type of plant:

SCR-DeNOx-plant

Location: RMZ Houthalen-Helchteren, BelgiumFeedstocks: Flue gases from waste incinerationCommissioning: 2002Capacity: 2 x 75'000 Nm3/hType of plant:SCR-DeNOx-Anlage
Location: RMZ Houthalen-Helchteren, Belgium
Feedstocks: Flue gases from waste incineration
Commissioning: 2002
Capacity: 2 x 75'000 Nm3/h
Type of plant:SCR-DeNOx-Anlage

Location:

RMZ Houthalen-Helchteren, Belgium

Feedstocks:

Flue gases from waste incineration

Commissioning:

2002

Capacity:

2 x 75'000 Nm3/h

Type of plant:

SCR-DeNOx-Anlage

Location: GEKAL KVA Buchs Aarau, SwitzerlandFeedstocks: Flue gases from waste incinerationCommissioning: 2004Capacity: 2 x 60'000 Nm3/h bzw. 1 x 180'000 Nm3/h SCR-DeNOxType of plant: Modification of the existing venturi scrubbers, reducing and mounting a steam heat exchanger for SCR-DeNOx
Location: GEKAL KVA Buchs Aarau, Switzerland
Feedstocks: Flue gases from waste incineration
Commissioning: 2004
Capacity: 2 x 60'000 Nm3/h bzw. 1 x 180'000 Nm3/h SCR-DeNOx
Type of plant: Modification of the existing venturi scrubbers, reducing and mounting a steam heat exchanger for SCR-DeNOx

Location:

GEKAL KVA Buchs Aarau, Switzerland

Feedstocks:

Flue gases from waste incineration

Commissioning:

2004

Capacity:

2 x 60'000 Nm3/h bzw.
1 x 180'000 Nm3/h SCR-DeNOx

Type of plant:

Modification of the existing venturi scrubbers,
reducing and
mounting a steam heat exchanger for SCR-DeNOx

Location: DIAE Geneva, SwitzerlandFeedstocks: Flue gases from municipal solid waste incineration after the boilerCommissioning: 2002Capacity: 3 x 130'000 Nm3/hType of plant: Raw gas SCR-DeNOx in low-dust circuit (retrofitting of ESP with one additional field each )
Location: DIAE Geneva, Switzerland
Feedstocks: Flue gases from municipal solid waste incineration after the boiler
Commissioning: 2002
Capacity: 3 x 130'000 Nm3/h
Type of plant: Raw gas SCR-DeNOx in low-dust circuit (retrofitting of ESP with one additional field each )

Location:

DIAE Geneva, Switzerland

Feedstocks:

Flue gases from municipal solid waste incineration after the boiler

Commissioning:

2002

Capacity:

3 x 130'000 Nm3/h

Type of plant:

Raw gas SCR-DeNOx in low-dust circuit (retrofitting of ESP with one additional field each )